Repairing Drip Edge On Roof
Align one end of the lower eave strip even with the edge of the roof decking.
Repairing drip edge on roof. Extend the mastic 12 inches each way from a nailed seam and eight inches. Step by step how to repair a roof edge finding the damage. Install roof drip edge along the eaves add underlayment then place drip. Raise the shingles and push the top rim of your drip edge beneath them.
Begin at the lower corner of the roof and gradually progress to the top. Albany roofing companies should be installing drip edge from the bottom of the rake up with each piece overlapping the next to prevent water infiltration. Ask this old house general contractor tom silva demonstrates the importance of a properly installed drip edge subscribe to this old house. Drip edge should always be cut with as few seams as possible to give a cleaner more seamless look.
At 7 05 paul begins replacing the drip edge roof flashing use a flat pry bar to remove drip edge nails along the eave and rakes. If there s a drip edge installed where the fascia meets your shingles and the gutter is hung below the drip edge get some roll flashing and tuck it up under the drip edge and over the top of the gutter. Any damaged plywood should be replaced. And apply a uniform layer into the nailed seams at each area with a plastic putty knife.
How to fix a roof drip edge installing roof drip edge flashing properly. Cut out the damaged section with a circular saw. To locate rotted areas of the roof s edge gently lift up shingles with a pry bar or taping knife. You may need to use a putty knife to break the seam between the first course and the starter strip.
Home centers sell rolls of 6 in. Place the metal roof drip edge flashing along the gable ends. Install the eave strips on the lower roof edges first with the eave strips under the shingles and felt underlayment. Once all the underlayment is applied go back and place.
Tack the end into position with the roofing nails and press the nail within the drip edge and into the roof covering. But do not push it through the fascia. Lift up roof shingles and nail the eave strip in place with galvanized. Open a container of roofing mastic.
Slide the flat bar under starter course and pry out the nails.