Replacing Roof In Sections
Before applying new roofing materials the deck should be inspected to determine that it is smooth straight and free of irregularities such as.
Replacing roof in sections. Check the damaged area for damage to the moisture barrier or flashing and check the damaged area for signs of seepage. Chapter four of the reroofing section labelled roof decks for reroofing provides that a deck as part of a roof assembly needs to provide structural support and be the substrate for the roof assembly. If not climb the roof and measure the opening so you can cut the replacement piece to be a perfect fit. Cracked or split shingles may be repaired without.
Depending on how the roofs join you may have to cut a slot to work it in far enough. It is a waterproofing layer made of regular felt stacked above the solid. Depending on the location and the size of the area in need of replacement it might be difficult to blend replacement shingles into the rest of the roof. Begin by removing the shingles down to the wood sheathing and slip a strip of adhesive ice and water barrier available where roofing repair products are sold under the soffit main roof joint.
If not replace bad wood with new plywood sheathing or 1 x 6 sheathing boards whichever is applicable to your type of roof. Repairing a section of. After cleaning the debris and reframing the roof lay down a base sheathing. A horizontal timber or metal resting at the peak of the roof the rafters and trusses are connected to the ridge board for a cohesive framework.
Eight foot 1 2 inch thick plywood is standard sheathing material. If you were able to keep the removed section in one piece measure it. Stagger the sheathing in a brick pattern for extra strength. However if the area in need of new shingles is located in an inconspicuous area or the section is relatively small you might be able to get away with nailing down some replacement shingles.
If the damage is more significant but confined to one side of the roof partial reroofing is an option that will cost thousands of dollars less than doing the entire roof. Make minor repairs on the roof if it is in good condition. Replace the roof decking select plywood or oriented strand board that is the same thickness as the wood you are replacing. Measure the opening of the section of roof to be shingled cut the plywood to size and nail to roof rafters.
This will make roof repair difficult in the future as it s much harder to roof just half of a home than it is to roof an entire home. A composite decking made of solid materials it resembles real wood and particularly strong and stable for bearing heavy load.